So what are the next steps for organizations that already rely on the SW-CMM or one of the other integrated models?
所以,已在依赖SW - CMM或者其它集成模型的组织的下一步行动是什么呢?
The CMMI is designed to replace these three models, and the SEI has released a sunset plan for the SW-CMM.
设计CMMI是为了代替以上三种模型,并且SEI已为SW - CMM发布了日落计划。
The Capability Maturity Model for Software (SW-CMM) v2.0 draft C.
Soft ware (SW - CMM) v2.0 draft C的能力成熟度模型。
应用推荐