To ensure the conservation of the wall have enough time (4 to 8 weeks), and fully dry, remove surface residue and any loose mortar material.
保证墙体有足够的养护时间(4~8周),并充分干燥,除去表面的灰浆渣和任何松动物质。
Pressure should be the formation of metal plates instal led, straight, there should be no construction of the plate surface residue and dirt.
压型金属板安装应平整、顺直,板面不应有施工残留物和污物。
In order to reflect the degree and trends of movement and deformation of surface residue, some points should be arranged on the surface for monitoring.
为了确切反映地表残余移动与变形程度和趋势,需对采空区地表进行布点监测。
应用推荐