movable-supported bridge-building equipment 移动支架造桥机
Washington Crossing Toll Supported Bridge 华盛顿跨河收费资助桥
pile-supported bridge pier 桩基桥墩
long span cable-supported bridge 长跨距悬吊体系桥梁
simple supported girder bridge 简支梁桥
cable-supported bridge 缆索支承桥梁
The removal of temporary bearings is one of the key procedures in the construction of transforming a simply-supported bridge structure into a continuous one.
临时支座的拆除是先简支后连续结构体系施工过程中的关键工序之一。
The removal of temporary bearings is one of the key procedures in the construction of transforming a simply-supported bridge structure into a continuous one.
方家寨大桥采用先简支后连续的施工方法,通过逐次接长连续梁、逐次拆除临时支座来实现结构体系转换。
The study provides the meaningful reference for anti-seismic safety design for railway simply supported bridge on hard-soil foundation.
笔者的研究成果为硬土质基础的铁路简支梁桥的抗震安全设计,提供了重要参考。
应用推荐