The principle, power supply structure and arrangement of the power supply plan in Central China are explained and the energy-saving policy is presented in this paper.
并根据能源、交通及电力需求情况说明华中地区电源规划的原则以及电源结构和布局,阐述电力系统节能对策。
For the economical dispatch scheme, it proposes the load prediction, power supply plan, generation dispatching plan, dispatching execution, assessment and account settling method.
提出了实施经济调度方案中的负荷预计和供电计划、发电调度计划、调度的执行、考核与结算的方法。
And lastly the establishment of urban land supply plan not only needs to give consideration for current impact by the earlier land supply, but also the current effects on the future land supply.
城市土地供给计划的制订不仅要考虑前期土地供给对本期土地供给的影响,也要考虑本期土地供给对后期土地供给的影响。
应用推荐