At the end of the superstructure assembly the boat is' theoretically 'water ready.
上层建筑组装之后,理论上船已做好了下水准备。
The forward end of the superstructure should not be too close to the bow to avoid a sense of clumsiness.
上层建筑的前端壁的起始点不宜过于接近船艏,否则会有呆笨的感觉。
Piles socketed in soft rock were traditionally regarded as end bearing piles, and the loads transferred from superstructure were assumed in design to be shouldered totally by the piles.
软岩地基上的嵌岩桩基础一般都认为是端承桩,设计时假定上部结构荷载全部由桩来承受,而不考虑桩间土的承载力。
应用推荐