The strength and stability analysis of Super-high arch DAMS built in conditions of complex topography and geology is an important subject in arch dam design and research.
复杂的地形地貌和地质条件下特高拱坝的强度与稳定分析是目前拱坝设计和分析中的重要研究课题。
In the project design of the Dongfeng Hydropower Station, the super thin high double curvature arch dam at the world level has been finally selected according to the continuous optimization design.
东风水电站工程设计中,经过不断的优化设计,最终选用了具有世界水平的超薄高双曲拱坝;
应用推荐