Distribution and capacity of the traction substation facility shall satisfy the requirement of the velocity aim traffic volume marshalling and running interval of main line.
牵引变电站设施的分布与容量应满足干线的速度目标、交通量、编组以及运行间隔要求。
Furthermore, as the load on a large substation grows, transformer capacity has to BE added.
此外,随着大型变电站的负荷增长,变压器的容量也必须增加。
The calculation process is proposed, which proves to be convinent for the capacity choosing of the storage battery in integrated automation substation.
该文介绍了其计算过程,对综合自动化变电站蓄电池容量的选择有一定的借鉴意义。
应用推荐