...程 的 支 持 , 它 包 括 在 线 完 成 信 息 请 求 RFI(Requestforlnformation)、 工程变更(ChangeOrder)、 提交请求(Submittals)及原始记录审批等, 并 对 处 理 情 况 进 行 跟 踪 统 计 。
基于6个网页-相关网页
SHOP DRAWING SUBMITTALS 呈交施工图
Submit schedule for approval within 90 days after general material submittals have been approved.
在批准一般材料提交资料后90天内提交一览表供批准。
Valve shall be installed in accordance with manufacturer's written Installation and Operation Manual and approved submittals.
应该按照制造商书面安装和操作手册和经过认可的资料来安装阀门。
The Contractor shall note that all material, product and equipment submittals require approval of the Project Manager after the same have been reviewed by the Consultant for acceptance.
承包商应注意,其所有材料、产品和设备提交项在经顾问审核接受之后,必须还要经过项目经理批准。
应用推荐