WBS Project Structure Analysis WBS项目结构分解
The project structure allows configuration of users based on role and the incorporation of specific data sources for analysis.
项目结构允许基于角色的用户配置,并且可以将特定的数据源包含到分析中。
Using international current correlation and regression analysis method, we make a project of capacity and structure of labor employment.
应用国际通行的相关回归分析方法,对“十五”时期上海市劳动就业容量与结构进行预测。
The combined algorithm also can provide the forward and backward level partitions which are very useful for analysis of the structure of project networks.
综合算法还能提供网络的正向和反向等级划分,这对工程网络的结构分析将是十分有益的。
应用推荐