This paper describes the structure planning, system generation and installation of HP 1000 computer operating system at Shanghai Observatory.
本文介绍上海天文台HP 1000计算机操作系统的结构设计,系统生成和安装。
Distribution Network Structure planning is a complex combinatorial optimization problem, which is difficult to solve properly by using traditional optimization methods.
配电网网架规划是一个复杂的组合优化问题,传统的优化方法往往难以解决此类问题。
Abstract: : the cost of the project to project budget, is through certain planning process, calculation and determine the price of a building or structure planning document.
摘要:对工程造价进行概预算,是通过一定的计划程序、计算和确定建筑物或构筑物价格的计划文件。
应用推荐