Through archaeological fieldwork, in particular the excavation of structural remains and the recovery of artefacts, we hope to fill in the blanks.
通过考古队的实地挖掘,尤其是一些建筑残留物和相关器具,我们希望能填补这一空白。
Through designing different drainage tank the paper studied different drainage conditions and time effects on structural strength formation of soft dredger fill, and carried out grey prediction.
通过设计不同排水条件的实验槽,研究了不同的排水条件及时间效应对吹填软土结构强度形成的影响,并对实测结果进行了灰预测。
Grey prediction can be used to predict structural strength formation of soft dredger fill in short-time, it gives reference to engineering practice.
灰预测可以用来对吹填软土结构强度形成进行短期预测,值得工程实践参考。
应用推荐