On the process of tunnel excavation in high geo-stress zone, surrounding rocks will have dynamic drift.
高地应力下的隧洞开挖过程中,围岩将产生动态的变化。
The displacements, the depth of tensile stress zone and the maximum value of tensile stress under the complex load were calculated.
计算出了双重荷载作用下的位移量、拉应力区的深度及最大拉应力值。
Kuche foreland basin thrust belt is strong compressional stress zone. It comes into being various complicated overriding structural style.
库车前陆盆地山前构造带为强挤压应力区,形成了各种复杂的推覆构造样式。
应用推荐