At end, the stree results of measurement and calculate are in good agreement, this means Numerical simulation analysis made in construction phase is accuracy; the stress monitor in construction phase is successful.
最终实测应力结果和计算应力结果吻合的比较好,这表明施工阶段的数值模拟分析是准确的、施工阶段的应力监测是成功的。
参考来源 - 大跨度连续梁桥悬臂施工阶段的应力分析·2,447,543篇论文数据,部分数据来源于NoteExpress
The structural stress monitor is one of main control contents in bridge constructing control.
结构应力监测是施工控制的主要内容之一。
Finally, analyze the real-time stress monitor data, and compare it with the theoretical value.
最后,将现场的应力实时监测数据进行分析处理,并与理论值加以比较。
Our product can carry on the greatest stress monitor in real time to the characteristic of the operating apparatus;
针对运行设备的特点,实时进行最大应力监测;