This paper presents a nonlinear Stress-Strain analysis of 2nd stage cofferdam of the Three Gorge Project.
本文对三峡工程二期围堰进行了非线性应力应变计算。
In this paper, nonlinear stress-strain analysis for a high earth-rockfill dam and its foundation cutoff is given.
本文对一痤高土石坝与基础防渗墙进行了非线性有限元分析。
In this paper, the stress-strain analysis and life prediction for the notched shafts were studied under multiaxial constant amplitude proportional loading.
本文针对多轴比例恒幅加载情况下的缺口件进行了应力应变分析和寿命预测研究。
应用推荐