The stormwater division sump to be constructed in twotimes, firstconstruction is forsole-plateandpart of wall board; secondconstruction is for wall topplate.
The open site was vulnerable to Sandy's storm surge because it didn't have a roof, said Steve Plate, the Port Authority's director of World Trade Center construction.