stop-ped the man 阻止了
The results indicated that before constructing the transitional roadbed the bending moment was produced in piles and would increase along with the increase of height of the transitional roadbed and it stopped to increase after the embankment construction was finished.
结果表明,在过渡段填筑之前,远处路基填土已在桩身产生了弯矩;在过渡段填筑期间,基桩弯矩随填土高度的增加而增加;过渡段路基填筑完毕,基桩弯矩也停止了增长。
参考来源 - 软基台后路基填土对桥台桩基侧向影响的试验研究·2,447,543篇论文数据,部分数据来源于NoteExpress
ADJ (of a pipe or tube, esp an organ pipe) closed at one end and thus sounding an octave lower than an open pipe of the same length 闭锁音的
应用推荐