During the rehabilitation construction of 1985, the asphalt facing was covered by the sand gravel with a stone pitching surface.
1985年对该坝采用 砂砾石料覆盖和沥青混凝土面板加固等综合措施进行了处理。
youdao
应用推荐
模块上移
模块下移
不移动