If activity of any system component is increasing throughout the test run, the system has not reached steady state.
如果任何系统组件的活动在测试运行过程中增加,则系统不会达到稳定状态。
The test plan can be configured to produce a steady-state workload or to introduce variability by alternating the load between multiple virtual machine groups.
配置测试计划来产生状态稳定的工作负载,或者通过调整多个虚拟机组之间的负载来产生变化。
During the steady state for the run we averaged about 1.5 million Lotus Domino transactions every 10 minutes during the test or about 9 million Lotus Domino transactions per hour as shown in figure 8.
在稳定状态期间,测试期间平均每10分钟有大约150万lotus Domino事务,即每小时大约有900万lotus Domino事务,如图8所示。
应用推荐