If the project is too large then people would have to wait too long to gauge the status of adoption.
如果项目过大,那么大家又将不得不等待很长时间才能评估实施的情况。
This paper proposes a status table method to solve the problem that the production of CDMA2000 long code will cost too much time under software radio and low end plat environment.
提出一种状态表查询的方法,可以有效地解决软件无线电和低性能平台环境下CD MA2000长码生成过程和生成时间较长的难点。
应用推荐