At the end of EIC transformation of Baosteel first coking plant, the response rate of the control station and operation station are found not up to the requirement.
宝钢一炼焦三电改造后期,发现控制站和操作站的响应速度不能达到要求。
In the construction of the centralized control station, the traditional remote control test method is hard to comply with the requirement of construction schedule.
在集控站建设中,传统的遥控试验方法难以满足建设工期的要求。
The paper analyzes the specific requirement of the post-station engineering of Qinghai-Tibet railway in system solution, equipment type selection and management mode.
分析青藏铁路站后工程在系统方案、设备选型与管理方式等方面的特定要求。
应用推荐