The main point of this paper introduces the situation of CDMA base-station construction of Sichuan Unicom in Dazhou.
本篇论文的重点是介绍了中国联通四川分公司达州CDMA网络基站工程的建设情况。
Discovery was poised to blast off at 7:43 p.m. EDT on the space station construction mission, running more than a month late.
美国东部夏季时间晚7:43,担任太空站建设任务的发现号于平稳升空,虽然比原计划晚了一个多月。
For the subway station construction method discussed in this paper, new type of temporary system - military beam system was used.
文中介绍的地铁车站施工中,采用新型临时路面系统——军用梁结构。
应用推荐