状态转换函数
基于1个网页-相关网页
neutral grounding state of transformer 变压器中性点接地方式
transformer state evaluation 变压器状态评估
transformer state assessment 变压器状态评估
transformer insulation state 变压器绝缘状态
·2,447,543篇论文数据,部分数据来源于NoteExpress
By collecting samples for SVM training, the optimal separating surface with the minimization structural risk is developed for real-time monitoring of the functioning of the state transformer fan.
通过采集风机样本进行SVM训练,拟合出具有最小结构风险的最优分类面,用于实时监测变压器风机的运转状态。
youdao
应用推荐
模块上移
模块下移
不移动