This paper deals with the linear-quadratic control problem with an inequality constraint on the state integration.
研究具有状态积分不等式约束的线性二次控制问题。
Therefore integration is left at a point-to-point state with glue code bloating with every new change that is implemented.
因此,集成保留点到点的状态,实现每个新的改变都将引起粘接代码的膨胀。
In a typical business process integration, processes generally share state in order to provide a collaborated process.
在一个典型的业务整合流程中,流程之间能分享状态以便提供一个相关联的流程。
应用推荐