This paper introduces the waterwall features and start-up procedure of domestic 600mw supercritical variable pressure operating once through boiler under development.
文中介绍正在研制的国产600 MW超临界变压运行直流锅炉水冷壁结构特点和启动过程。
They can save a lot of time and money in start-up procedure calculations.
在开工过程计算中,它们可以节约大量的时间和资金。
So the start-up operation procedure can be taken as finding the optimal operation path from various existing paths, and making the system transfer from the given initial state to the goal state.
因此,开车操作程序可以看从众多存在的路径中寻找一条优化的操作路径,使系统由给定的初始状态转移到目标状态。
应用推荐