...配生产计划排序问题 1.2.2 单一车间计划排序问题 汽车装配涉及冲压、焊装、涂装、总装四大工艺过程,途径冲压车间(Stamping Shop)、 焊装车间(Body shop)、涂装车间(Paint Shop)、总装车间(Assembly shop)。
基于6个网页-相关网页
The Kanban managed production in stamping shop with characteristics of DCAC has scientifically applied the principles of JIT. This article expounds the structure and application of the system.
具有神龙特色的冲压车间看板管理生产,科学应用了准时生产制原理,阐述了其体系构造和具体应用。
Maintaining power system, control system of machine and equipment, automatic-control system in stamping shop, to ensure production line smoothly running. Breakdown service within the shortest time.
负责冲压车间所有供电、设备电气及自动化系统的维护保养和维修,保证生产线正常运行,当发生故障时,在最短的时间内修复设备。
I am the company's engineering staff for cold stamping molding parts are well aware of, and has its own mold shop.
我公司的工程人员对冷冲压成型的零件有深刻认识,并有自己的模具制造车间。
应用推荐