During both of the stages analysis, we got to know the bridge's properties about mechanical and deformation and the different working state exerted in different seismic loads.
在这一系列的分析过程中,了解了高墩连续刚构桥在弹性范围内的受力和变形情况,在弹塑性阶段墩结构在不同地震作用下的工作状态。
Additional stages then collect and aggregate these results and load them through an ODBC connection to the analysis database.
然后附加阶段搜集并汇总这些结果,并通过OD BC连接将其加载到分析数据库中。
Planning for availability is completed through multiple stages of collecting data that will act as inputs into the analysis.
规划可用性贯穿收集将作为输入到分析中的数据的多个阶段。
应用推荐