Rock salt highway subgrade construction is a special construction method.
岩盐路基施工为特殊的路基施工。
Therefore, a special construction set-up had to be developed for the panelling of the showers.
因此,建筑必须设置一个特殊的镶板淋浴。
Special construction allows for our chucks to have both internal and external grip in a single unit.
特殊的设计使得在同一产品上可实现内外两种加紧方式。
应用推荐