As a critical issue, there was never a definition of funding across implementations — organizations requesting a solution became funding points without cost recovery.
一个严重的问题在于,从来就不存在跨实现的资助定义——请求某个解决方案的组织成了没有成本回收的资助点。
There are many points in a solution design where timeouts can and should be configured.
在解决方案设计中有多个应配置超时的点。
The optimal solution would still be the integer point (2, 0), though more integer points are feasible now.
优化解决方案仍然是整数点(2,0),不过现在可行域中有更多整数点了。
应用推荐