Synopsis Cellular concrete has gained popularity as a "Soil replacement material" in many geotechnical applications.
多孔混凝土用作土的代替材料已开始广泛运用在岩土工程中。
A contractor was hired to drain the reservoir and to excavate soil from one area for replacement with clay.
一个承包商被雇来排干蓄水池里的水,然后挖出其中一块地方的泥土,换上粘土。
Remediation has involved the identification of contaminated areas in the villages, removal of all contaminated soil, its disposal in secure landfill sites and its replacement with clean soil.
整治工作涉及到确认村庄里的污染区域,除掉所有受污染的土壤,将受到污染的土壤丢弃在安全填埋场并且用干净的土壤进行替换。
应用推荐