Flexible project management requires a balance of both the left and right brain, hard and soft skills.
敏捷项目管理需要在左/右大脑,硬/软技能间作出权衡。
In a hard lock-up, investors have no right to redeem before their time is up; in a soft lock-up, they can get out early but have to pay a redemption fee of, say, 3-5%.
在硬性期权锁定中,投资者在到期之前无权赎回其投入的资金;在软性期权锁定中,他们能够早早的退出但不得不支付据说有3 - 5%的赔偿金。
As a friend in Congress once told me, "You are right about the importance of combining soft power with hard power, but I cannot talk about soft power and hope to get re-elected."
我在国会的一个朋友曾这么跟我说过:“关于结合软硬实力的重要性,你说得没错,但我要是一提软实力,就别想再次当选了。”
应用推荐