·2,447,543篇论文数据,部分数据来源于NoteExpress
By the end of the phase you should have an operational system, though some rough edges may remain to smooth out.
尽管有些粗糙的边缘需要平整化,但是在此阶段结束前您应该拥有一个可以运行操作的系统。
Attend the installation and commission of instrument during the capital construction and production preparation phase to ensure smooth start-up of plant.
在基建施工和生产准备阶段,参与机械设备安装、试,确保装置顺利开车投产。
This new algorithm can detect and repair cycle slips after loss of lock within 3 seconds so as to avoid the effect of cycle slips on smooth pseudo distance of carrier phase.
检验证明该方法能够准确可靠地探测并修复失锁3秒以内的周跳,避免了周跳对载波相位平滑伪距的影响。
应用推荐