This paper analyzes and summarizes the quality common faults in sinking well construction.
本文就沉井施工中的质量通病进行了分析和总结。
It is difficult to dig rock in sinking well due to the requirements of protecting well bore and achieving effective crashing of rock.
沉井井筒内水下开挖岩石技术难度大,既要保护井筒不受损伤,又要达到岩石破碎效果。
The invention relates to an internal supporting pile for supporting the sinking well structure, which is formed by a plurality of pile sections in a detachable assembly mode.
本发明涉及一种支撑沉井结构的内支撑桩,其由若干段桩节采用可拆卸 的安装方式组成。
应用推荐