Private single family residential construction spending increased 3.89% as compared to February 2009 but still remains some 75.48% below the peak set in February 2006.
私人单户家庭的城市建筑开支比2009年2月增加3.89%,但仍然比最高的2006年2月低75.48%。
For example, the master single-tier schedule in Figure 10 has the overall Construction phase divided into three six-week periods.
例如,图10中单层的综合图表将整个构建阶段分为三个六周的周期。
The Army Corps of Engineers in early March awarded a $370-million single design-build contract for the headquarters to Hensel Phelps Construction.
在三月初,美国陆军工程部授予了Hensel Phelps建筑公司这份价值3.7亿美元的新总部单独设计、建设合同。
应用推荐