Aided with the rich soft and hard resources of PC, multi-axis simultaneous movement was realized.
借助于PC机丰富的软、硬件资源,实现了多轴联动控制。
Simultaneous movement along the MC 'curve is therefore inconsistent with the assumed conditions of supply of factors of production.
因此,同时沿着MC曲线移动与假设的生产要素供给条件是相矛盾的。
A good effect is achieved when using this programming algorithm in the NC system of a fiber wrapping machine with multi-axis simultaneous movement.
将该规划算法用于多坐标联动纤维缠绕机的数控系统中,效果很好。
应用推荐