Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.
运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。
The flood simulation in flood detention basin is the basis of non engineering measure such as risk analysis and resident hazard prevention.
蓄滞洪区洪水模拟是风险分析与居民防洪避险等非工程措施的重要依据。
In the analysis, the "quantitative risk assessment" technology and "stochastic simulation technique for non-Guassian multivariate random variables with different correlations" technology are used.
分析过程中,运用了定量风险评估技术和多维随机变量联合概率随机模拟技术。