Disposing the optimum location of a relative tolerance zone of the closed dimension can simplify the adjustment process of an assembly production.
将封闭环协调公差带配置在最佳位置,可使产品装配的调校过程简化。
The framework relies on the flow path management technology which can simplify and balance the material flow in plant, and make the control and management of the production process easy.
该框架借助基于约束理论的混流路径管理技术,可以简化和均衡工厂中的物料流,并使生产过程易于控制和管理。
The technology has advantages that decrease the cost of production, shorten the crystallization period, and simplify synthesis process.
此工艺具有生产成本低,晶化时间短、过程简单等特点,是有工业应用前景的生产方法。
应用推荐