It is concluded that to extend the nonlinear analysis scheme in the design of arch dam can lead to more economic design and more simple profile of dam.
从而可知,在拱坝设计中推广非线性分析方案可以导致更经济的设计和更简单的拱坝体型。
The purpose of this research is to establish a simple and practical mathematical model for the water retention curve in unsaturated section of upstream embankment constructed tailings dam.
本研究的目的是建立一种简单实用的上游式尾矿坝非饱和带滞水曲线的数学模型。
According to the safe slope ratio of earth-filled core wall and the seepage calculation of earth dam, a simple method to calculate the core wall thickness of earth dam is given.
文章从心墙填筑填土料的安全渗透比降为基础,结合土坝的渗流计算,得出土坝心墙厚度的简便计算方法。
应用推荐