The dam, completed in 1936, is used for flood and silt control, electric power, irrigation, and domestic and industrial water supplies.
水坝完成于1936年,用于防洪和控制淤积,还能发电、灌溉、供给家庭和工业用水。
Finally the proposal was presented on the integrated control of river silt.
并对于河流淤泥综合治理提出了建议。
The results showed that the sediment both in cage fish farming and control area belonged to clay-silt type, and no differences were observed.
结果表明,养殖区和对照区沉积物类型均是黏土质粉砂,没有明显差异;
应用推荐