Forbow hard grounding, damagepathwill go toward the side ofship hull, and thecontactbetween the shipandthe rockwill change graduallyfromintenseimpacttolateralpressandslipfriction.
First, once the ship has been stabilized, an underwater platform will be built and watertight boxes, or caissons, fixed to the sideof the ship that is above water.