The key point of dispatching command during the process of drawing operative scheme for railway stations is the shunting locomotive operation plan.
铁路车站作业计划编制过程中,调机运用计划是调度指挥的关键。
The paper points out that loading according to train formation plan and organizing high quality trains are the efficient ways of reducing shunting operation.
按列车编组计划组织装车和组织高质量列车,是减少调车作业的有效途经。
The key point of dispatching command during the process of drawing operative scheme for railway stations is the shunting locomotive operation plan.
研究铁路车站作业计划编制过程中 ,如何编制调机运用计划的关键问题 。
应用推荐