Based upon the shield construction practice in the portal section of South Tube of Yanan Donglu Tunnel, this paper demonstrates the technology for slurry balance shield passing through freezing zone.
本文以上海延安东路隧道南线盾构进洞段工程施工为背景,论述了泥水平衡盾构穿越冻结加固区的施工技术。
Change of earth pressure, pore water pressure, underground water level, surface deformation, and sub-surface movement all have direct relationship with distance between shield and testing section.
土压力、孔隙水压力、地下水位、地面变形及深层土体移动的变化都跟掘进机与测试断面之间的距离有直接关系。
Larger tunnel section brings larger exposed area and higher risks when shield departs from the working shaft, so the stability of reinforced soil in this stage is the new challenge for the work.
隧道断面越大,封门拆除时加固土体所暴露的面积也越大,施工风险也就越高。
应用推荐