Thecompleted heat shield is scheduled to be ready for installation onto the Orioncrew module at Kennedy next summer.
明年夏天在肯尼迪,这个完工的热盾将按计划准备好安装到“猎户座”乘员舱。
Poor shield connection is one of the biggest sources of connection problems in the installation of coaxial cable.
不良的遮蔽连接是安装同轴电缆中,最大的连接问题的来源之一。
The LWLs of 35kV lines with and without lightning shield lines, in which various installation ways of MOAs used as line surge arresters are adopted, are compared;
具体比较了雷击有、无避雷线的线路,采取不同避雷器安装方案时的耐雷水平;
应用推荐