The deep dewater of one section in Shenyang subway No. 1 line is very difficult.
沈阳地铁一号线某标段深层降水难度较大。
Newlywed couples take a ride on Line 1 to experience a "subway wedding" in Shenyang, Liaoning province on Sept 27, 2010.
2010年9月27日,来自辽宁沈阳的多对新人搭乘地铁一号线体验了一把“地铁婚礼”。
The results are important references and can be put into operation for the subway project in Shenyang.
该成果可为即将投入运营的沈阳地铁工程提供重要参考。
应用推荐