A Kuka robot with 2,200-pound payload capacity places material blanks onto the shear load table.
一个负重能力为1000公斤的库卡机器人正在把板料装载到剪板机的工作台上。
The table relates sheathing thickness, nail size and spacing, sheathing grade and allowable unit shear to enable determination of an appropriate construction configuration.
表中涉及覆板厚度,钉的大小和间距,覆板等级和允许单位剪切,来确定适当的施工构造。
The analysis shows, the PRC code give greater base shear than UBC in most cases. A comparison table is given for engineering application.
分析表明,在绝大多数情况下,框架结构国标地震基底剪力大于UBC计算值,最后给出了结果对比表以方便工程应用。
应用推荐