go top

有道翻译

shear column

剪切列

以上为机器翻译结果,长、整句建议使用 人工翻译

双语例句

  • In the connection design of steel structure, the shear plate with high-strength bolt connection is extensively used at the flexible joint where the beam is connected to the weak axis of the column.

    结构节点设计方向柔性连接常采用剪力高强螺栓连接,螺栓群所承受的荷载有竖向力和偏心力矩。

    youdao

  • The steel ratio at the bottom of a large beam should be restricted to avoid possible column failure in shear.

    对于端剪切破坏采用限制大梁底部纵向钢筋方法予以避免

    youdao

  • In addition to vertical shear force, slab-column connections also have to transfer unbalanced moment due to combined vertical and lateral forces as a result of wind effect or earthquake excitations.

    风荷载地震荷载等水平荷载竖向荷载共同作用下,板节点除了传递垂直剪力外,必须传递较大平衡弯矩

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定