The observation results of the bridge head experimental site of Jialichen Bridge are analyzed such as vacuum degree, ground water table, flowrate, pore water pressure and surface settlement.
通过对浃里陈大桥桥头试验段的真空度、地下水位、流量、孔隙水压力、地表沉降等现场监测结果的分析;
The results of test and settlement observation show that the methods can ensure the quality of the sinking pile.
试验和沉降观测结果说明,该施工方法能保证沉桩质量。
The results from observation after the pavement construction show that the settlement control is very successful.
道面工程完成后的观测结果表明:其沉降控制是非常成功的。
应用推荐