This paper states the viewpoint that the exceeding long temperature crack and settlement crack in concrete structure can be solved by later casting zone.
混凝土结构中经常遇到超长的问题,本文就混凝土结构超长的温度缝和沉降缝是否均可设后浇带解决的问题,阐述了自己的观点。
Compared with pile foundation, settlement of composite foundation is much greater and easily to produce crack or incline in upper structure.
和桩基相比,复合地基一般沉降过大,若不能合理控制沉降量,易使上部结构产生裂缝或倾斜。
The seriously uneven settlement of soft ground causes tunnel wall crack after the completion of permanent tunnel lining.
某隧道在完成二次衬砌后,软弱地基产生不均匀沉降致使边墙严重开裂。
应用推荐