First of all, the building and its urban setting lead to spatial permeability between the two through an "urban pit stop".
首先,建筑机器城市配套通过通过一个“城市休息站”形成两个空间之间的空间渗透性。
The work principle of inclined pipe and setting device is analyzed, the feasibility in reforming sludge pit by shallow layer settling technology is approached.
分析了斜管沉淀装置的工作原理,探讨了应用浅层沉淀技术改造捞坑的可行性。
应用推荐