Article 16 the release regulatory reports released by the dispatched offices of the SERC shall be filed with the SERC for record.
第十六条国家电力监管委员会派出机构发布监管报告,报国家电力监管委员会备案。
The design capacity of some power supply facilities in the country fell short of the actual demand, according to the SERC report.
国家电力监管委员会的调查显示,国内一些供电设施的设计发电能力无法满足实际需求。
According to the State Electricity Regulatory Commission (SERC), increasing coal supply pressure has forced domestic power plants to stop operation occasionally.
国家电力监管委员会表示,不断增加的煤炭供应压力迫使国内发电厂不时地停止运营。
应用推荐