·2,447,543篇论文数据,部分数据来源于NoteExpress
It will save considerable machining time to use more than one tool in one machine to perform several machine operations either in sequence or simultaneously.
在一台机器上使用数种刀具来顺次或同时进行几项机器操作,将节省大量加工时间。
This function moves each frame back in time from the last image in the sequence to the first.
该函数按时间反向移动各帧,从图像序列的最后一幅到最前一幅。
The vertical axis represents time in sequence diagrams, but the timing diagram USES the horizontal axis to represent time.
垂直线代表了序列图之中的时间,但是计时图使用水平线来代表时间。
应用推荐